The Icebreaker Wind project is a proposed 20.7-MW demonstration wind farm in lake Erie that will consist of six, 3.45-MW turbines. Icebreaker Wind will interconnect with the Cleveland Public Power transmission system at the Lake Road 138kV substation. The interconnection study process is complete, and rights are secured to participate in the PJM market. View a close-up of the map here.